Fabber

Free tool for CNC, welding and fabrication shops

Price a job from setup, cycle time and material

Margin and markup aren't the same number. A 35 % markup is only a 26 % margin. Put in one of your jobs and see both prices side by side, and how setup spreads as the quantity grows.

The job
Programming, fixturing, first article
Running it
Loading, deburr, inspection
Bought in
Anodize, heat treat, plating
The supplier's minimum or setup charge

Lot price at 35 % margin: $1,038.50; at 35 % markup: $911.25

Setup labor$112.50
Hands-on labor$62.50
Machine time$275.00
Material$105.00
Outside processing$120.00
Cost of the lot$675.00
Cost per part$27.00
35 % margin

Profit as a share of the price

$41.54
per part · $1,038.50 for the lot
Contribution $363.50$127.25 more than the other way
35 % markup

Profit added on top of cost

$36.45
per part · $911.25 for the lot
Contribution $236.25$127.25 less than the other way

Same job, other quantities

QuantityPer part at 35 % margin
1$296.31
10$57.46
25$41.54
50$36.23
100$33.58
250$31.98
500$31.45

Runs in your browser; nothing you type is sent anywhere.

How to price a machining or fabrication job

What's the difference between margin and markup?

Markup is profit as a share of cost; margin is profit as a share of the price. A part that costs $100 and sells for $135 has a 35 % markup but only a 26 % margin. Quote by margin if your targets come from your profit and loss statement, which is measured against sales.

How do I spread setup over a quantity?

Add the setup cost (programming, fixturing or jigs, first article) once per lot, then divide the lot's total by the quantity. That's why 10 parts cost far more each than 100: the same setup is shared by fewer parts. Some customers prefer setup as a separate one-time charge, so repeat orders can skip it.

What should a job shop quote include?

Setup time at your setup rate, cycle time at the machine's hourly cost, hands-on time (loading, fit-up, welding, deburr, inspection) at the labor rate, material per part including the cut-off and remnant, outside processing such as anodize, powder coat, galvanizing or heat treat with the supplier's lot charge, and packing and shipping. Then price the total by your target margin.

Should machine time and labor be costed separately?

Yes. A machine running unattended still costs its hourly rate, but nobody's wage. Costing the whole cycle at a labor rate overprices lights-out work; costing hands-on time at the machine rate underprices deburr and inspection.

Then find out what it really cost

Fabber quotes this way, sends the customer one exact version to approve, records setup, machine time, scrap and material on the floor, and shows estimate against actual when the job ships. The next quote starts from the real numbers.

Set up your shop