Quality paperwork
The paperwork your customers ask for, made from the job itself
Tell Fabber what each customer needs with every shipment. The certificate of conformance, material certs and inspection report are built from what was recorded on the job, so nobody retypes a heat number at the end of the day.
Certificate of conformance
- BRK-100 rev B · 24 pcs · PO 4471
- 6061-T6 · heat H25-0233
- Anodize: Clear Coat Co · cert 88121
Inspection report
- Slot width 6.00–6.05 · 6.03 · pass
- Bore Ø12.00 ±0.02 · 12.01 · pass
- Recorded by Sam, Oct 6
Packing slip D-1007
- 24 of 40 · balance to follow
- Ship to Acme Robotics, Dayton
- Material certs enclosed
Material traceability
Record the material lot used on a job, with its heat or lot number, supplier and mill cert. The CoC lists it; the certs go with the shipment.
Certificates of conformance per shipment
Each shipment gets a packing slip and, when the customer needs one, a certificate of conformance naming the part, revision, quantity, PO, material heat and lot numbers and outside processors, with your shop's conformance statement.
Inspection reports and non-conformances
Measured checklist results become an inspection report: each characteristic, the tolerance, the reading, pass or fail, who and when. Parts that don't meet the drawing get an NCR with a disposition: scrap, rework, use as is, or return to the supplier.
Outside processing with a paper trail
Send parts to the anodizer, heat treater or plater with a supplier PO, receive them back with their cert, and see what's still out on Today.
Questions
- Is Fabber AS9100 or ISO 9001 certified?
- Software isn't certified; shops are. Fabber keeps the records a quality system relies on, but it makes no aerospace or medical compliance claims, and it isn't for ITAR or CUI data.
- Is the inspection report an AS9102 first article report?
- No. It's a record of the measured checks on the job. Shops that need AS9102 forms still fill those in.
Also in Fabber
- Drawing and revision controlEvery job is tied to the drawing revision the customer approved.
- Shop floor and travelersA job pack for every part on a shop tablet: the approved drawing, timers for setup, machine and hands-on time, part counts, checklists with tolerances, and QR code travelers.
- Scheduling and the floor boardSee every operation on the floor as Running, Ready, Blocked, At supplier or Waiting, plan work onto machines by day, and keep promise dates in view.
- Quoting and RFQsQuote CNC, welding and fabrication work from setup, cycle time, material and outside processing, priced by margin or markup, with price breaks and an approval link your customer can sign.
- Job costing and invoicingEvery job shows quoted against actual cost, line by line: setup, machine, labor, material, outside processing and scrap.
- A website for your shopPublish a page buyers can find: your machines, the materials you work, services, certifications and photos, with a request-for-quote form that lands as a draft quote.
See it with your own jobs
Set up your shop in an afternoon, or explore a sample shop full of fictional jobs first. 14 days free, no card needed.