Job-shop software for CNC, welding and fabrication shops with 1–15 peopleWhich drawing?How many good parts?What's left?Who's waiting?What did it cost?
Your next quote starts from what the last run really cost.
Every job should answer these from its own record, not from a paper traveler and three spreadsheets. Fabber connects the quote, the approved drawing, the shop floor, the paperwork and the invoice.
The sample shop opens in seconds, no email needed. It's private to you and full of fictional jobs. Setting up your own takes about 20 minutes, with 14 days free and no card needed.
- Ordered
- 40
- Good
- 32
- Scrap
- 2
- Shipped
- 24
- Left
- 16
- Promised
- Oct 16
| Cost | Quoted | Actual |
|---|---|---|
| Setup labor | $75.00 | $90.00 |
| Machine | $360.00 | $342.00 |
| Outside · anodize | $125.00 | $102.50 |
| Material | $151.20 | $163.80 |
One record from request to invoice
The job's routing, start to finish. Nothing is retyped between steps, so nothing is lost between them.
OP 10
Quote
Requests from your website or inbox become draft quotes. Price from your rates by margin or markup, with price breaks.
OP 20
Approve
The customer approves one exact version from a link, with their PO. That approval becomes the job.
OP 30
Make
The floor works from the job pack: the approved drawing, timers, counts, measured checks and setup notes.
OP 40
Ship and bill
Packing slips, certificates and invoices from what was made, then on to QuickBooks or Xero.
Which drawing?
The machine runs the revision the customer approved
Parts keep their revisions, drawings, models and programs together. A quote names the revision it prices, the approval locks it, and the job pack shows that file and no other. When the customer sends rev C, the job doesn't change until someone decides it should.
- Revisions that can't drift. Each part has a list of revisions with their files.
- Change requests, not surprises. A new revision on a part with open jobs raises a change request on each of them.
- Setup notes that come back next time. Notes and photos an operator leaves on an operation (the fixture, the offsets, the trick that worked) are saved on the part and shown in the job pack the next time it runs.
BRK-100 · revisions
- First article, 2025BRK-100-A.pdf · BRK-100-A.stepUsed on 3 jobs
- Slot widened to 6.05BRK-100-B.pdf · O1042.ncOn J-1042 · files locked
- Sent by Acme, Oct 6BRK-100-C.pdfNew
Rev C arrived. J-1042 is running rev B.
How many good parts?
A traveler that counts, times and checks as the work happens
Operators open the job pack on a tablet at the machine. It shows the approved drawing, the operations in order, the setup notes from last time and the checklist. Timers and counts go straight onto the job, so the office knows what's done without walking the floor.
- Timers that know machine time from labor. Setup, machine run and hands-on time are separate timers.
- Counts that follow the parts. Good, scrap and rework are counted per operation.
- Checklists that judge the measurement. Write the tolerance into the checklist item ("Bore 12.00 ±0.02", ".500 +.000/-.002", "Ra 1.6 max") and the operator types what they measured.
- Good
- 32
- Scrap
- 1
- Reached it
- 33
Checklist
What's left?
What's running, what's ready, and what's stuck, at a glance
Today shows the whole floor as a board: every open operation in one of five lanes, with what blocks it. The schedule lets you drag work onto a machine and a day, and warns you when a plan doesn't fit, without pretending to plan the shop for you.
- The floor board. Running, Ready, Blocked, At supplier and Waiting.
- Plan by machine and day. Drag operations onto machines across the week.
- Promises in view. Due and promised dates, blanket-order releases and outside processing due back are all on Today, with the jobs that are late at the top.
Running 1
Ready 2
Blocked 1
At supplier 1
Who's waiting?
Quote from the real costs, and get the yes in writing
Requests arrive from your website form or by email and become draft quotes with their drawings. You price them from your own rates, send a link, and the customer approves one exact version, with their name, the date and their PO. That approval becomes the job.
- Requests that land as draft quotes. Put a request form on your website, or give customers your shop's own RFQ email address.
- Prices built from your shop. Operations from your machines and labor rates, material per part or per lot (with a bar-stock calculator), outside processing per lot or per part, packing and shipping.
- A ship date you can keep. While you quote, Fabber works out the earliest the parts could ship if approved today: behind the hours already booked on the machines they need, plus each supplier's usual turnaround.
Price breaks: choose one quantity
What did it cost?
Know what every job really earned, before you quote the next one
The time, counts, material and supplier bills recorded on the floor add up to the job's actual cost, next to what you quoted. Ship what's ready, invoice it, and send the invoices to your accounting system. The next quote for the part starts from what this run really took.
- Estimate against actual, line by line. Setup labor, machine time, hands-on time, material, outside processing and packing, each quoted against actual.
- Ship, invoice, get paid. Partial shipments with packing slips and certificates, invoices per shipment or for the rest, deposits and payments.
- Which customers are worth it. A scorecard per customer from what really happened: margin and contribution per shop hour on finished jobs, how fast they pay, what's overdue, how often they change revisions mid-job, how many parts they reject, and how many quotes they accept.
Quote again from J-1042 · actual hours, today's rates
| Operation | Quoted | Took |
|---|---|---|
| Mill · cycle | 12.0 min | 13.5 min |
| Setup | 1.0 h | 1.2 h |
| Deburr · hands-on | 2.0 min | 1.5 min |
The new quote uses 13.5 min on the mill. Last time's price would have lost $2.10 a part.
And the paperwork
The paperwork your customers ask for, made from the job itself
Tell Fabber what each customer needs with every shipment. The certificate of conformance, material certs and inspection report are built from what was recorded on the job, so nobody retypes a heat number at the end of the day.
- Material lots with heat numbers and mill certs
- Certificates of conformance per shipment
- Inspection reports from measured checks
- Non-conformances with a disposition
- Supplier POs for outside processing
- Packing slips for partial shipments
Certificate of conformance
- BRK-100 rev B · 24 pcs · PO 4471
- 6061-T6 · heat H25-0233
- Anodize: Clear Coat Co · cert 88121
Inspection report
- Slot width 6.00–6.05 · 6.03 · pass
- Bore Ø12.00 ±0.02 · 12.01 · pass
- Recorded by Sam, Oct 6
Packing slip D-1007
- 24 of 40 · balance to follow
- Ship to Acme Robotics, Dayton
- Material certs enclosed
Dayton, Ohio
Precision CNC machining for robotics and automation
Request a quote →Our machines
- Haas VF-4 · 4-axis mill
- Haas ST-20 · CNC lathe
- Brother S700 · drill-tap
Materials we work
And a website for your shop
A website that brings in requests, made from what's already in Fabber
Many small shops have no website, or one nobody has touched in years, so buyers searching for a shop nearby never find them. Fabber publishes one at your-shop.fabber.io from the machines, materials and request form you already keep, plus a few lines and photos of your own. It's off until you turn it on.
- Your own address: your-shop.fabber.io
- Machines and materials from your records
- Services, certifications and photos
- A request form that lands as a draft quote
- Titles and structured data for search
- Included with every shop
Made for how small shops run
- Labor time and machine time are recorded separately, so an unattended run isn't costed as an operator's wage.
- Scrap adds cost, never billable parts. Margin and markup are never confused.
- A missing supplier bill shows as missing, not as zero, until it arrives.
- Operators see the job, not your prices. Owners see everything.
- Export all of your records and files whenever you want.
Between the clipboard and the ERP
Most small shops run on paper travelers and spreadsheets, or on software sized for a plant with a planning department. Fabber is sized for the shop in between.
| What matters | Paper and spreadsheets | A big-shop ERP | Fabber |
|---|---|---|---|
| Getting started | Already there | Weeks to months, often with paid onboarding | An afternoon |
| Price for a 6-person shop | Free, plus the hours | Usually priced per seat | $99 a month for everyone |
| Quote from what the last run took | If someone kept the notes | Yes, after setup | Yes, a click |
| Customer approves online | Email and a phone call | Sometimes | Yes, with their PO |
| Right drawing at the machine | Whatever was printed | Yes | Locked to the approved revision |
| Usable on a shop tablet | Paper is | Depends on the system | Built for it |
| Certs and CoCs | Typed up at the end | Yes | From the job's own records |
One price per shop
$99 per month
or $900 a year (save $288), plus any sales tax or VAT
14 days free, no card needed. We'll email you before the trial ends.
- Everyone in the shop, office and floor
- Every feature on this page
- Floor stations on shared tablets
- Your own shop website
- Drawings and files kept with every job
- QuickBooks Online and Xero exports
- A full export of your data, any time
- Email support from the people who build it
- Cancel any time
- On-premises deployment on request
Who's behind it
Made by a small team, for shops like yours
Fabber is built by GekkoTech d.o.o. Sarajevo, a small software company. Support email goes to the people who build it, and what shops ask for shapes what gets built next.
Questions before you start?
Ask about your shop, your paperwork or moving off spreadsheets.
Email support@fabber.ioQuestions owners ask
Who is Fabber for?
Owner-run job shops with 1 to 15 people: CNC machining, welding and fabrication, sheet metal and other made-to-order manufacturing. Shops that quote custom work, make it to drawings and ship it with paperwork.
How long does it take to set up?
About 20 minutes: your rates, your machines, a few materials and the operations you quote most. You can explore a sample shop full of fictional jobs first.
What does it cost?
One price per shop for everyone and every feature: $99 a month, or $900 a year, plus any sales tax or VAT. Every shop starts with 14 days free, with no card.
Can I get my data out?
Yes. Owners can download every record and every file as a zip at any time, from Settings.
Does it work on tablets and phones?
Yes. The shop floor screens are built for tablets with big buttons, and the office screens work on a phone in a pinch.
Can we run Fabber on our own servers?
Yes, on request. For shops that need their records on their own hardware or network, we offer on-premises deployment, set up and priced per shop. Email support@fabber.io to ask.
Can I use it for ITAR or export-controlled work?
Not on the hosted service. It isn't in an environment approved for ITAR, EAR or CUI data, so those drawings must stay out of it.
Run your next job from one record
Look around a sample shop full of fictional jobs, or set up your own in an afternoon. 14 days free, no card needed.