Fabber

Job-shop software for CNC, welding and fabrication shops with 1–15 peopleWhich drawing?How many good parts?What's left?Who's waiting?What did it cost?

Your next quote starts from what the last run really cost.

Every job should answer these from its own record, not from a paper traveler and three spreadsheets. Fabber connects the quote, the approved drawing, the shop floor, the paperwork and the invoice.

Set up your shop

The sample shop opens in seconds, no email needed. It's private to you and full of fictional jobs. Setting up your own takes about 20 minutes, with 14 days free and no card needed.

Job J-1042 · Acme Robotics · PO 4471
BRK-100 · Motor bracket
Running
Ordered
40
Good
32
Scrap
2
Shipped
24
Left
16
Promised
Oct 16
Quoted against actual cost
CostQuotedActual
Setup labor$75.00$90.00
Machine$360.00$342.00
Outside · anodize$125.00$102.50
Material$151.20$163.80

One record from request to invoice

The job's routing, start to finish. Nothing is retyped between steps, so nothing is lost between them.

  1. OP 10

    Quote

    Requests from your website or inbox become draft quotes. Price from your rates by margin or markup, with price breaks.

  2. OP 20

    Approve

    The customer approves one exact version from a link, with their PO. That approval becomes the job.

  3. OP 30

    Make

    The floor works from the job pack: the approved drawing, timers, counts, measured checks and setup notes.

  4. OP 40

    Ship and bill

    Packing slips, certificates and invoices from what was made, then on to QuickBooks or Xero.

Which drawing?

The machine runs the revision the customer approved

Parts keep their revisions, drawings, models and programs together. A quote names the revision it prices, the approval locks it, and the job pack shows that file and no other. When the customer sends rev C, the job doesn't change until someone decides it should.

  • Revisions that can't drift. Each part has a list of revisions with their files.
  • Change requests, not surprises. A new revision on a part with open jobs raises a change request on each of them.
  • Setup notes that come back next time. Notes and photos an operator leaves on an operation (the fixture, the offsets, the trick that worked) are saved on the part and shown in the job pack the next time it runs.
More about drawing and revision control

BRK-100 · revisions

  • First article, 2025BRK-100-A.pdf · BRK-100-A.stepUsed on 3 jobs
  • Slot widened to 6.05BRK-100-B.pdf · O1042.ncOn J-1042 · files locked
  • Sent by Acme, Oct 6BRK-100-C.pdfNew

Rev C arrived. J-1042 is running rev B.

Move J-1042 to rev CFinish to rev B

How many good parts?

A traveler that counts, times and checks as the work happens

Operators open the job pack on a tablet at the machine. It shows the approved drawing, the operations in order, the setup notes from last time and the checklist. Timers and counts go straight onto the job, so the office knows what's done without walking the floor.

  • Timers that know machine time from labor. Setup, machine run and hands-on time are separate timers.
  • Counts that follow the parts. Good, scrap and rework are counted per operation.
  • Checklists that judge the measurement. Write the tolerance into the checklist item ("Bore 12.00 ±0.02", ".500 +.000/-.002", "Ra 1.6 max") and the operator types what they measured.
More about the shop floor and travelers
BRK-100 · Motor bracketJ-1042
10Mill
20Deburr
30Anodize
40Inspect
Stop hands-on 0:42 Start setup
Good
32
Scrap
1
Reached it
33

Checklist

Slot width 6.00–6.05 accept 6–6.056.03 Pass

What's left?

What's running, what's ready, and what's stuck, at a glance

Today shows the whole floor as a board: every open operation in one of five lanes, with what blocks it. The schedule lets you drag work onto a machine and a day, and warns you when a plan doesn't fit, without pretending to plan the shop for you.

  • The floor board. Running, Ready, Blocked, At supplier and Waiting.
  • Plan by machine and day. Drag operations onto machines across the week.
  • Promises in view. Due and promised dates, blanket-order releases and outside processing due back are all on Today, with the jobs that are late at the top.
More about scheduling and the floor board

Running 1

J-1042 · Op 20DeburrDue in 5 days

Ready 2

J-1045 · Op 10Turn · ST-10Due tomorrow
J-1046 · Op 30InspectDue Oct 20

Blocked 1

J-1039 · Op 10Waiting on 6061 barDue Oct 14

At supplier 1

J-1041 · Op 30Anodize · back ThuDue Oct 17

Who's waiting?

Quote from the real costs, and get the yes in writing

Requests arrive from your website form or by email and become draft quotes with their drawings. You price them from your own rates, send a link, and the customer approves one exact version, with their name, the date and their PO. That approval becomes the job.

  • Requests that land as draft quotes. Put a request form on your website, or give customers your shop's own RFQ email address.
  • Prices built from your shop. Operations from your machines and labor rates, material per part or per lot (with a bar-stock calculator), outside processing per lot or per part, packing and shipping.
  • A ship date you can keep. While you quote, Fabber works out the earliest the parts could ship if approved today: behind the hours already booked on the machines they need, plus each supplier's usual turnaround.
More about quoting and RFQs
Quote Q-1018 · Motor brackets

Price breaks: choose one quantity

25 pcs$41.54 each
50 pcs$33.90 each
100 pcs$29.12 each
Lee ParkPO NW-2210
Approve 50 pcs · $1,695.00Recorded: who, when, this version

What did it cost?

Know what every job really earned, before you quote the next one

The time, counts, material and supplier bills recorded on the floor add up to the job's actual cost, next to what you quoted. Ship what's ready, invoice it, and send the invoices to your accounting system. The next quote for the part starts from what this run really took.

  • Estimate against actual, line by line. Setup labor, machine time, hands-on time, material, outside processing and packing, each quoted against actual.
  • Ship, invoice, get paid. Partial shipments with packing slips and certificates, invoices per shipment or for the rest, deposits and payments.
  • Which customers are worth it. A scorecard per customer from what really happened: margin and contribution per shop hour on finished jobs, how fast they pay, what's overdue, how often they change revisions mid-job, how many parts they reject, and how many quotes they accept.
More about job costing and invoicing

Quote again from J-1042 · actual hours, today's rates

OperationQuotedTook
Mill · cycle12.0 min13.5 min
Setup1.0 h1.2 h
Deburr · hands-on2.0 min1.5 min

The new quote uses 13.5 min on the mill. Last time's price would have lost $2.10 a part.

And the paperwork

The paperwork your customers ask for, made from the job itself

Tell Fabber what each customer needs with every shipment. The certificate of conformance, material certs and inspection report are built from what was recorded on the job, so nobody retypes a heat number at the end of the day.

  • Material lots with heat numbers and mill certs
  • Certificates of conformance per shipment
  • Inspection reports from measured checks
  • Non-conformances with a disposition
  • Supplier POs for outside processing
  • Packing slips for partial shipments
More about quality paperwork
riverside-machine.fabber.io

Dayton, Ohio

Precision CNC machining for robotics and automation

Request a quote →

Our machines

  • Haas VF-4 · 4-axis mill
  • Haas ST-20 · CNC lathe
  • Brother S700 · drill-tap

Materials we work

60617075304 SSDelrin

And a website for your shop

A website that brings in requests, made from what's already in Fabber

Many small shops have no website, or one nobody has touched in years, so buyers searching for a shop nearby never find them. Fabber publishes one at your-shop.fabber.io from the machines, materials and request form you already keep, plus a few lines and photos of your own. It's off until you turn it on.

  • Your own address: your-shop.fabber.io
  • Machines and materials from your records
  • Services, certifications and photos
  • A request form that lands as a draft quote
  • Titles and structured data for search
  • Included with every shop
More about shop websites

Made for how small shops run

  • Labor time and machine time are recorded separately, so an unattended run isn't costed as an operator's wage.
  • Scrap adds cost, never billable parts. Margin and markup are never confused.
  • A missing supplier bill shows as missing, not as zero, until it arrives.
  • Operators see the job, not your prices. Owners see everything.
  • Export all of your records and files whenever you want.

Between the clipboard and the ERP

Most small shops run on paper travelers and spreadsheets, or on software sized for a plant with a planning department. Fabber is sized for the shop in between.

What mattersPaper and spreadsheetsA big-shop ERPFabber
Getting startedAlready thereWeeks to months, often with paid onboardingAn afternoon
Price for a 6-person shopFree, plus the hoursUsually priced per seat$99 a month for everyone
Quote from what the last run tookIf someone kept the notesYes, after setupYes, a click
Customer approves onlineEmail and a phone callSometimesYes, with their PO
Right drawing at the machineWhatever was printedYesLocked to the approved revision
Usable on a shop tabletPaper isDepends on the systemBuilt for it
Certs and CoCsTyped up at the endYesFrom the job's own records

One price per shop

$99 per month

or $900 a year (save $288), plus any sales tax or VAT

14 days free, no card needed. We'll email you before the trial ends.

  • Everyone in the shop, office and floor
  • Every feature on this page
  • Floor stations on shared tablets
  • Your own shop website
  • Drawings and files kept with every job
  • QuickBooks Online and Xero exports
  • A full export of your data, any time
  • Email support from the people who build it
  • Cancel any time
  • On-premises deployment on request

Who's behind it

Made by a small team, for shops like yours

Fabber is built by GekkoTech d.o.o. Sarajevo, a small software company. Support email goes to the people who build it, and what shops ask for shapes what gets built next.

Questions before you start?

Ask about your shop, your paperwork or moving off spreadsheets.

Email support@fabber.io

Questions owners ask

Who is Fabber for?

Owner-run job shops with 1 to 15 people: CNC machining, welding and fabrication, sheet metal and other made-to-order manufacturing. Shops that quote custom work, make it to drawings and ship it with paperwork.

How long does it take to set up?

About 20 minutes: your rates, your machines, a few materials and the operations you quote most. You can explore a sample shop full of fictional jobs first.

What does it cost?

One price per shop for everyone and every feature: $99 a month, or $900 a year, plus any sales tax or VAT. Every shop starts with 14 days free, with no card.

Can I get my data out?

Yes. Owners can download every record and every file as a zip at any time, from Settings.

Does it work on tablets and phones?

Yes. The shop floor screens are built for tablets with big buttons, and the office screens work on a phone in a pinch.

Can we run Fabber on our own servers?

Yes, on request. For shops that need their records on their own hardware or network, we offer on-premises deployment, set up and priced per shop. Email support@fabber.io to ask.

Can I use it for ITAR or export-controlled work?

Not on the hosted service. It isn't in an environment approved for ITAR, EAR or CUI data, so those drawings must stay out of it.

Run your next job from one record

Look around a sample shop full of fictional jobs, or set up your own in an afternoon. 14 days free, no card needed.

Set up your shop